Skip to content

Guide · Process

Snagging and handover checklist for new Dubai property

A room-by-room snagging checklist for new Dubai homes, the handover steps, and the developer's 10-year structural and 1-year fixtures liability.

VNBy , Founder & Editor Fact-checked against primary sourcesUpdated 27 Oct 2026
3 min read

Key takeaways

  • Inspect the unit and agree a written snag list before signing handover documents.
  • Developers are liable for structural defects for 10 years and fixtures for 1 year from completion.
  • Check walls, doors, windows, plumbing, electrics and air conditioning against the SPA specification.
  • A professional snagging inspection finds defects owners usually miss.
  • Report later defects in writing, with photos, as soon as you find them.

Snagging is the inspection of a new property for defects before or at handover, so the developer fixes them at its own cost. In Dubai, inspect before you sign the handover documents and list every defect in writing. Developers are responsible for structural defects for 10 years and for defects in fixtures and installations for 1 year from completion, under Dubai Law No. 6 of 2019 on jointly owned property. A professional snagging company typically takes a few hours for an apartment.

The handover sequence

  1. Completion notice. The developer confirms the building is complete and tells you what you still owe.
  2. Final payment. Pay the handover instalment (or arrange a mortgage), plus any outstanding service charges and admin fees.
  3. Utilities. Register DEWA (and the chiller provider, if separate) in your name.
  4. Inspection (snagging). Walk through the unit with the developer's handover team or your own inspector.
  5. Snag list. Agree a written list of defects and a timeline for fixing them.
  6. Keys and access. Collect keys, access cards and parking.
  7. Title deed. Once fully paid, your Oqood registration is converted into a title deed. See title deed, Oqood and Ejari.

Don't sign 'accepted as is'

Read the handover form carefully. Sign only once the snag list is attached and acknowledged by the developer.

Your snagging checklist

Walls, floors and ceilings

  • Cracks, uneven paint, damp patches, hollow-sounding tiles
  • Chipped or misaligned tiles, uneven grout, scratches on wooden floors
  • Gaps around skirting boards and ceiling cornices

Doors and windows

  • Doors that close and lock properly, with even gaps
  • Window seals, handles and locks; no draughts or water marks
  • Balcony doors that slide smoothly, with sealed thresholds

Kitchen and bathrooms

  • Water pressure and hot water at every tap
  • Leaks under sinks, around toilets and at shower drains (run water for several minutes)
  • Bathroom floors that slope to the drain, with sealed joints
  • Appliances supplied as specified, and working

Electrical

  • Every socket, switch and light working
  • The distribution board labelled, with breakers tested
  • Data and TV points as specified

Air conditioning

  • Each unit cooling correctly, without noise or dripping
  • Thermostats working in every room

Specification

  • Finishes, appliances and layout match your SPA and the developer's specification sheet
  • Measure the main rooms if area matters to you

Professional snagging: worth it?

For most buyers, yes. A professional inspector uses moisture meters, thermal cameras and checklists, finds defects owners usually miss, and produces a report the developer can act on. The cost is small compared with the price of the property, and the work is done before your warranty clock starts to matter.

What the developer must fix

TypeDeveloper responsibilityBasis
Structural defects10 years from completionDubai Law No. 6 of 2019; UAE Civil Transactions Law
Fixtures and installations (MEP, fittings)1 year from completionDubai Law No. 6 of 2019
Items on your agreed snag listWithin the agreed timelineYour handover documents

Report any defect you find after handover in writing, with photos, as soon as you spot it.

If the developer doesn't fix defects

Escalate in writing to the developer's customer service, then to the community or building management. Disputes can be raised with the Dubai Land Department. Keep your snag list, photos and all correspondence.

Buying off-plan? Read how to check a developer and project before you commit, and ready vs off-plan to weigh the options.

Share this

Free shortlist · 30 seconds

Which Dubai areas fit you? Start here.

Pick your goal, then your budget in AED or rupees. We match it against registered sales and show the areas that fit, with typical prices and yields.

Primary sources

Every guide is reviewed against these sources at least every six months and whenever rules change. See our editorial standards.

Frequently asked questions

What is snagging in Dubai?+

Snagging is inspecting a new property for defects at handover so the developer fixes them at its own cost before or soon after you move in.

How long is the developer warranty in Dubai?+

Under Dubai Law No. 6 of 2019, developers are responsible for structural defects for 10 years and for defects in fixtures and installations for 1 year from completion.

Should I hire a snagging company in Dubai?+

For most buyers, yes. Professional inspectors use specialist tools and checklists, and their report gives the developer a clear list to fix.

What should I check at property handover?+

Walls, floors and ceilings, doors and windows, kitchen and bathroom plumbing, all electrical points, air conditioning, and that finishes match the SPA specification.

Free · Monthly

Get the monthly Dubai report

Prices, yields and volumes for the areas that matter, in one short email on the first week of each month. No spam, unsubscribe anytime.